Phase 1: Budget, costing, design, contractor selections.
- It's not gonna be a super duper hse reno this time. Been there, done that. Well, it may sound corky, but I thank Allah for all the rezeki. So, this time is about space. Living in Penang island.. huh, you can imagine for people like us, can't afford a bungalow but alhamdulillah, this house will just provide us the right space that we need for our passions, hobbies, and biz.
- Time for design. As usual, we came out with our own detailed drawings using 3D Home Architect sw. Visited MegaHome, HomeDec, Perfect Living, Penfurnex, etc.. which was held one after another in consecutive months. (I love Penang for that matter :-) ). That's where we get to compare and choose IDs, kitchen specialists, furnishing and fittings with good bargains. What we did was to show them our designs and ask for quotes. Hmm.. not really a smooth sailing process as we revised our designs couples of times due to I couldn't make up my mind bw open and closed concept kitchen, urghhh!!!!! Finally, I decided with closed concept, more comfortable with it. Ahhaa.. 2 contractors/specialists for my kitchen (wet/dry) as well as wardrobes. Why? simply becoz the other contractor can't fulfill my requirements.
- Tracking the expenses that go to the house is an on-going process. I'm tasked to track it. Luckily not to fork out fr my own pocket, thanks dear!
Phase 2: Renovation and furnishing
- OC (now they call a diff name, can't remember) was obtained in end July. We got the key on 10th Aug. Wow! Quite impressed with the nice handover folder with the key holders and complete manuals, do's & don'ts etc..
- Time for defect checking. Overall, we're satisfied w the neat finishing. Initial inspection discovered most problems come from the hair line cracks at some areas. Others like water seepage (due to rain) at window, and minor problems of loose taps. At the time of 1st inspection, cudn't test the water supply as the electrical water pump wasn't turned on. Defects list #1 submitted together w reno deposit. Must take note that no structural change allowed due to strata title (a landed house with strata title). Soon after water pump turned on, we discovered few problems and the major one is the water mark on the wall near MBR2, at L3 staircase. As of today, the rectification work is still going on.
- Went thru with the contractors the detailed SOW. Target completion latest by 21st Oct. Whoever comes across my blog and interested in the contractor details, feel free to tinkle me The photos are meant for yr reference. I can share my experience and recommend accordingly..
- Started about 3 weeks ago, right after raya. Thus, bz with the follow-ups, material selections, fitting and furnishing.. I made a point to visit the contractor almost every other day. Alhamdulillah, it's progressing well, so far. Anyway, like mentioned, it's just a simple reno..
- Completed so far; brick walls, glass shower screen installation and fan installation
- This wk target: back yard flooring, delivery of aircons, fridge, washing machine (the shop dun want to deliver twice :-( ). Install air-con, lightings, wet kitchen concrete and tile frame. Cleanup on weekends.
- Next week ending Oct 14 ; wet kitchen and wardrobe for MB2, shoe cabinet, curtains. Cleanup and touch up on weekends. Start moving small items by car.
- The final week ending Oct 21; dry kitchen, MB1, RM1 and RM2. Delivery of beds, sofa, dining table. Cleanup and touch up on weekends by my hubby (I'll be away in KL for 3 days for a course). Continue moving items by car
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgkQluW3thhfSawKe32A2GHar8QULYYlcOFPn3P6G_ztk3eAhmoZ8_1zawlvc7UM9BGYiudrSWY2NeRLLk5Nd4rKqp3IodufCab4o12T0n_kQsFEL9VDIt6T2y7TfB0xZKxEwO55v__ZCU/s200/downlite2.jpg)
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgd4XvXLiAdqQG3yUm2NoLex6Roxt24LuQ9lzWgwlTkNOj8DnycsKE50_HxcIk18d-xXw7LdYP5tPmZ9DpIaJguZDDUQU1InUZ9eO4-dplSyDsAX12Kng1tUlfaqWudve8nbArrqIgQD0k/s200/wet+kitch+reno2.jpg)
Phase 3: Move in!!! (will update later..)