Reno work is at 95% completion. Pending solid surface installation for dry kitchen, and MBR2 wardrobe, and some touch up for shoe cabinet. Target solid surface to be installed within this week while wardrobe installation for MBR2 has to be deferred due to MBR2 bathroom leaking. It has been about 1++ mths, the developer contractor still hasn't been able to fix it once and for all. I have to push and press them almost every other day. Tips; a must do test to detect bathroom leaking i.e ponding test for at least 24hrs. You can use papers wrapped in a plastic (see pic) and later take it off, or simply use old newspaper which you can later push down the floor trap.
As for the solid surface, the guy promised to complete the installation last week, but hampeh.. Till todate, am a bit unsatisfied with my dry modular kitchen cabinets. Of all my houses, this is the one that I'm not very happy with. Limited choices of material patterns, surprisingly kedekut material (smaller boxes, in terms of depth and design). Will be extra careful the next time if I ever choose modular again.
Some pics[pics]
DIY project to install curtain railings. Quite a tough job esp for the curve railing. It's of different type of railing and roller, and to bend the railing requires some expertise. Lucky me, my hubby is a handy man and he has all the required gadgets to make it happen. [pics]
No comments:
Post a Comment